Question: Please show all steps An infrastructure development project has the following risk factors. DESCRIPTION Risk Factor A B D Reduced supply of basic materials Worker

Please show all steps
An infrastructure development project has the following risk factors. DESCRIPTION Risk Factor A B D Reduced supply of basic materials Worker injuries Extended project duration Community dis-approval due to Resettlement requirement Water leakage Equipment malfunction Likelihood Rating 1 3 5 4 Impact Rating 4 3 4 5 E F 2 1 4 5 LIKELIHOOD Rating: (1) Rare, (2) Unlikely, (3) Possible, (4) Likely, (5) Almost certain. IMPACT Rating: (1) Insignificant, (2) Low, (3) Moderate, (4) High, (5) Catastrophic/Failure. a) Draw the RAM Matrix. b) Identify the critical risk factors, moderate risk factors, and low risk factors. c) For each risk factor, write a short description of your recommendations for "Mitigation" measures to minimize the risk associated with each factor. An infrastructure development project has the following risk factors. DESCRIPTION Risk Factor A B D Reduced supply of basic materials Worker injuries Extended project duration Community dis-approval due to Resettlement requirement Water leakage Equipment malfunction Likelihood Rating 1 3 5 4 Impact Rating 4 3 4 5 E F 2 1 4 5 LIKELIHOOD Rating: (1) Rare, (2) Unlikely, (3) Possible, (4) Likely, (5) Almost certain. IMPACT Rating: (1) Insignificant, (2) Low, (3) Moderate, (4) High, (5) Catastrophic/Failure. a) Draw the RAM Matrix. b) Identify the critical risk factors, moderate risk factors, and low risk factors. c) For each risk factor, write a short description of your recommendations for "Mitigation" measures to minimize the risk associated with each factor
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts