Question: PLEASE SHOW ALL STEPS. SHOW ALL WORK AND EXPLAIN YOUR ANSWER. PLEASE DO EVERY STEP. WRITE WITH BLACK PEN AND PAPER ONLY - NO TYPING.
PLEASE SHOW ALL STEPS. SHOW ALL WORK AND EXPLAIN YOUR ANSWER. PLEASE DO EVERY STEP. WRITE WITH BLACK PEN AND PAPER ONLY - NO TYPING. PLEASE WRITE VERY NEATLY - NO CURSIVE AT ALL



E T U
The Dulac Box plant works two 8-hour shifts each day. In the past, 400 cypress packing boxes were produced by the end of each day. The use of new technology has enabled them to increase productivity by 25%. Productivity is now approximately A. 31.25 boxes/hr. B. 81.25 boxes/hr. C. 62.5 boxes/hr. O O O O D. 40.6 boxes/hr. E. 300 boxes/hr. The Dulac Box plant works three 8-hour shifts each day. In the past, 800 cypress packing boxes were produced by the end of each day. The use of new technology has enabled them to increase productivity by 25%. Productivity is now approximately A. 300 boxes/hr. B. 62.50 boxes/hr. C. 33.33 boxes/hr. D. 30.00 boxes/hr. E. 41.67 boxes/hr. The Dulac Box plant works two 10-hour shifts each day. In the past, 800 cypress packing boxes were produced by the end of each day. The use of new technology has enabled them to increase productivity by 25%. Productivity is now approximately A. 40.00 boxes/hr. B. 80.00 boxes/hr. C. 100.0 boxes/hr. D. 300 boxes/hr. E. 50.00 boxes/hrStep by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
