Question: please show all work! thank you! OBJECTIVE 3 Example 13.5 Brief Exercise 13-24 Continuous Flow vs. Departmental Manufacturing Mabbur Company has the following departmental manufacturing
OBJECTIVE 3 Example 13.5 Brief Exercise 13-24 Continuous Flow vs. Departmental Manufacturing Mabbur Company has the following departmental manufacturing layout for one of its plants: 10 minutes 5 minutes Move and wait time - 20 minutes Wait time - 12 minutes Welding Cutting Move and wait time - 25 minutes 7 minutes 8 minutes Move and wait time - 18 minutes Polishing Finishing A consulting firm recommended a value stream with the following manufacturing cell: 10 minutes 5 minutes Welding Cutting VITO Croce Polishing Finishing 8 minutes 7 minutes Required: 1. Calculate the total time it takes to produce a batch of 10 units using the traditional departmental manufacturing layout. 2. Using cellular manufacturing, how much time is saved producing the same batch of 10 units? Assuming the cell operates continuously, what is the production rate? Which process controls this production rate? 3. Assume the processing time of Welding is reduced to 6 minutes, while the times of the other processes stay the same. What is the production rate now, and how long will it take to produce a batch of 10 units if the cell is in a continuous production mode
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
