Question: PLEASE SHOW ALL WORK WITH EXPLAINATION 2. (5) Chapter 4, Problem #10 Extension Question: Redesign the workstation to achieve 30 jobs(lifts)/hour. In your answer, you

PLEASE SHOW ALL WORK WITH EXPLAINATION

PLEASE SHOW ALL WORK WITH EXPLAINATION 2. (5) Chapter 4, Problem \#10Extension Question: Redesign the workstation to achieve 30 jobs(lifts)/hour. In your answer,

2. (5) Chapter 4, Problem \#10 Extension Question: Redesign the workstation to achieve 30 jobs(lifts)/hour. In your answer, you can change any parameters but you must select two parameters and plot the relationship between those parameters and the FM or Frequency. . A standing inspector picks up 25lb castings from a conveyor 50 in from the floor with a horizontal distance of 20in. He then puts the casting on a work area 20in lower than the conveyor and closer to the body (a minimum horizontal distance) for inspection. For good ones, he twists 90 to the right and sets it on another conveyor 30 in from the floor with a minimum horizontal distance. For bad ones, he twists 90 to the left and sets it on a third conveyor 30 in from the floor with a minimum horizontal distance. How many castings per minute can he inspect for an 8-h shift so as to be acceptable according to NIOSH guidelines? Redesign the job, at minimal cost (i.e., no costly robotics or automation), so as to double production but still keep back strain to acceptable levels

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!