Question: Please show full procedure. Do not copy from other chegg answers or you will get a thumbs down. Simply as that l Ampere, Inc., produces

Please show full procedure. Do not copy from other chegg answers or you will get a thumbs down. Simply as that

Please show full procedure. Do not copy froml

Please show full procedure. Do not copy from

Please show full procedure. Do not copy from

Please show full procedure. Do not copy from

Ampere, Inc., produces a line of electric meters in residential buildings which are installed by electric utility companies to measure power consumption. Produced meters are of two basic types for different voltage and amperage ranges. In addition to complete meters, some parts and subassemblies are sold separately for repair or product changes purposes. EXHIBIT 14.13 Product Structure for Meters A and B Meter type Meter type Level 0 B Level 1 C(1) Level 2 D(1) D(1) E() F(1) B(2) E(1) F(1) F(2) E(1) R(2) Level 3 Exhibit shows the hassemblies and parts that make up the meters and shows the members of units required per unit of parent in parentheses Source: Chase, Aquilano, and Jacobs (2001) PARTE METER A METER B KNOWN RANDOM SUBASSEMBLY D KNOWN RANDOM 60 200 400 70 300 60 180 70 500 60 250 70 400 60 200 70 300 60 150 70 700 60 160 70 MONTH 3 4 5 6 7 8 KNOWN 1000 600 300 700 600 700 RANDOM 250 250 250 250 250 250 KNOWN 300 350 300 250 200 200 RANDOM 80 80 80 80 80 80 C(1) D(1) E(1) F) R(2) EXHIBIT 14.11 Future Requirements for Meters A and B. Subassembly D. and Part E Stemming from Specific Customer Orders and from Random Sources Meter A Meter B Subassembly D Par E 10 17 1.250 850 550 560 460 360 270 250 320 380 430 Source: Chase, Aquilano, and Jacobs (2001) EXHIBIT 14.15 ITEM ON-HAND INVENTORY Number of Units on A 50 B 60 C Hand and Lead Time Data That Would Appear on the Inventory Record File 40 D 30 E 30 F 40 Source: Chase, Aquilano, and Jacobs (2001) Build the MRP schedule for week 9. Consider both dependent and independent demands MRP Matrix for Ampere Inc. 11 Week 13 12 14 15 EXHIBIT 14.12 A Master Schedule to Satisfy Demand Requirements as Specified in Exhibit 14.11 16 LEAD TIME (WEEKS) 2 2 1 1 1 1 Bem A(LT=2) Grose requirement On-Hand Net requirement Planned order receipt Planned order release B(LT=2) requirements On-Hand Net requirement Planned order receipt Planned order release C(LT=1) requirements On-Hand Net requirement Planned order receipt Planned order release Planned order receipt Planned order once release 4 4 5 5 5 6 6 6 7 7 7 Weeks 8 8 8 9 9 10 10 11 10 11 11 12 13 14 12 13 14 12 13 14 D(LT=1) Grass requirements On-Hand Net requirement Planned order receipt Planned order release E(LT=1) Gross requirements On-Hand Net requirement Planned order receipt Planned order release F(LT=1) Grass requirements On-Hand Not F(LT=1) Gross requirements On-Hand Net requirement Planned order receipt Planned order release 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 8 8 8 8 9 9 9 10 11 12 13 14 10 11 12 13 14 10 11 12 13 14 10 11 12 13 14

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!