Question: Please show the complete solution. thanks Assembly Line Balancing No. of Sta Ave Time R value % Load Hrs/pc Pcs/shift OP No. 05 10 15

Please show the complete solution. thanks
Assembly Line Balancing No. of Sta Ave Time R value % Load Hrs/pc Pcs/shift OP No. 05 10 15 20 25 30 35 40 45 50 Std Time .306 .291 .260 .356 .310 .555 .250 .415 .250 .501 The Marketing De artm wants a 2,500 pieces per 8-hr shift. 1. Determine the Takt time (R value) at 80% production efficiency. 2. Compute: a. Takt time (R value) b. Average time C. % Load d. Hrs/pc e. Output (PCS) per 8-hr shift Assembly Line Balancing No. of Sta Ave Time R value % Load Hrs/pc Pcs/shift OP No. 05 10 15 20 25 30 35 40 45 50 Std Time .306 .291 .260 .356 .310 .555 .250 .415 .250 .501 The Marketing De artm wants a 2,500 pieces per 8-hr shift. 1. Determine the Takt time (R value) at 80% production efficiency. 2. Compute: a. Takt time (R value) b. Average time C. % Load d. Hrs/pc e. Output (PCS) per 8-hr shiftStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
