Question: Please show the complete solution. thanks Assembly Line Balancing No. of Sta Ave Time R value % Load Hrs/pc Pcs/shift OP No. 05 10 15

Please show the complete solution. thanks

Please show the complete solution. thanks

Assembly Line Balancing No. of Sta Ave Time R value % Load Hrs/pc Pcs/shift OP No. 05 10 15 20 25 30 35 40 45 50 Std Time .306 .291 .260 .356 .310 .555 .250 .415 .250 .501 The Marketing De artm wants a 2,500 pieces per 8-hr shift. 1. Determine the Takt time (R value) at 80% production efficiency. 2. Compute: a. Takt time (R value) b. Average time C. % Load d. Hrs/pc e. Output (PCS) per 8-hr shift Assembly Line Balancing No. of Sta Ave Time R value % Load Hrs/pc Pcs/shift OP No. 05 10 15 20 25 30 35 40 45 50 Std Time .306 .291 .260 .356 .310 .555 .250 .415 .250 .501 The Marketing De artm wants a 2,500 pieces per 8-hr shift. 1. Determine the Takt time (R value) at 80% production efficiency. 2. Compute: a. Takt time (R value) b. Average time C. % Load d. Hrs/pc e. Output (PCS) per 8-hr shift

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!