Question: Please show the work for SDs, SDb and SDp. (SD=Standard deviation) Using the table above. 14 ote Pult Nool Ex: -Scenarios Prob Stoch bond (W20,4)
Please show the work for SDs, SDb and SDp. (SD=Standard deviation) Using the table above.
14 ote Pult Nool Ex: -Scenarios Prob Stoch bond (W20,4) (Wg 20.6) Severe Recesso 0,05 -37 20,2 Mild Recesson 0.25 11 15 4,6 Normal growth 10.40 8 10.4 Det Boom loh 10.30 30-5 a wit des brod ut us Elis)-ley. 6.-18.63067 E (18)=5% 58= 8.27047. Verity!? bood E($=79. 1.-6.6522). 2008 t E((s)-(0,05%-37) + (0,25x-11) + (0.40x14)+10.30x30) = 10%. destuen owl 6()=6058-4) + (0.75x15) +0.4x8) +0.38-5) 6522 EG) -(0.05-20,2) + (0.25x46) +(0.4% 10.4) + (0.3 x 9) = 7). 8p? 8 ? thig tilt to mata
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
