Question: Please show work and explain the answer. 1. Given the following information: Inventory on Hand: Z=0 A=0 B=0 Routing File: z Bill of Materials: Lot

Please show work and explain the answer.

Please show work and explain the answer. 1. Given

1. Given the following information: Inventory on Hand: Z=0 A=0 B=0 Routing File: z Bill of Materials: Lot size Part WC Setup (min) Run Time (min/unit) 5.0 B (3) C (4) 100 75 50 Z B 30 40 50 35 25 45 2.0 3.0 Work Center Master File: Work Center Available Time Ave. Efficiency* 90 30 40 50 6000 min. 6000 min. 6000 min. 1.10 1.05 *Average efficiency is based on processing time only. C. Develop a Capacity Bill with lot sizing for Z. D. The Master Production Schedule (MPS) calls for 600 units in Week 1 and 820 in week of product Z. Fill in the Work center loads (minutes) for the two weeks in the table below: Week 1 Z Week 2 Z WC 30 40 50 E. Do you see any problems related to this MPS? Explain. 1. Given the following information: Inventory on Hand: Z=0 A=0 B=0 Routing File: z Bill of Materials: Lot size Part WC Setup (min) Run Time (min/unit) 5.0 B (3) C (4) 100 75 50 Z B 30 40 50 35 25 45 2.0 3.0 Work Center Master File: Work Center Available Time Ave. Efficiency* 90 30 40 50 6000 min. 6000 min. 6000 min. 1.10 1.05 *Average efficiency is based on processing time only. C. Develop a Capacity Bill with lot sizing for Z. D. The Master Production Schedule (MPS) calls for 600 units in Week 1 and 820 in week of product Z. Fill in the Work center loads (minutes) for the two weeks in the table below: Week 1 Z Week 2 Z WC 30 40 50 E. Do you see any problems related to this MPS? Explain

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!