Question: PLEASE show work I'll like the post A copy machine is available 16 hours a day. On a typical day, the machine needs to process
PLEASE show work I'll like the post
A copy machine is available 16 hours a day. On a typical day, the machine needs to process 240 jobs. Each job takes about 1.5 minutes on the machine: 1 minute of setup time (logging in, defining the job) and 0.5 minute of processing time. About 25% of the jobs need to be reworked, in which the set-up time and the processing time have to be repeated once. In the remaining time, the equipment is idle. You would need to show steps and use 2 decimal places. (a)[2] Draw a tree diagram to show the breakdown of equipment time. Later, specify values. (6)[2] Define and calculate component and total non-value added time in minutes. (c)[2] Define and calculate component and total value-added time in minutes. (d)[2] Calculate total waste time in minutes. Give a detailed breakdown of waste time. Xe)[2] What is the OEE? What is the wasted work percentage? %, 2 decimals, i.e. 23.67%) Note: You would need to put all calculated time values in the tree diagram
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
