Question: Please show work. Kolbys Korndogs is looking at a new sausage system with an installed cost of $514,000. This cost will be depreciated straight-line to
Please show work.
Kolbys Korndogs is looking at a new sausage system with an installed cost of $514,000. This cost will be depreciated straight-line to zero over the projects four-year life, at the end of which the sausage system can be scrapped for $102,000. The sausage system will save the firm $190,000 per year in pretax operating costs, and the system requires an initial investment in net working capital of $48,000.
| Required: |
| If the tax rate is 40 percent and the discount rate is 9 percent, what is the NPV of this project? (Do not round intermediate calculations. Round your answer to 2 decimal places (e.g., 32.16).) |
| NPV | $ |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts