Question: please solve and do required A-C correctly thank you Howell Corporation's activity based costing system has three activity cost pools-Machining, Setting Up and Other. The

please solve and do required A-C correctly thank you
please solve and do required A-C correctly thank you Howell Corporation's activity

Howell Corporation's activity based costing system has three activity cost pools-Machining, Setting Up and Other. The company's overhead costs, which consist of equipment depreciation and Indirect labor, are allocated to the cost pools in proportion to the activity cost pools' consumption of resources Iquipement depreciation (total) 3 34,400 Indieet Labor (total) 7.738 Distribution of Resource Consumption Across Activity Cost Pools 0.46 Equipment depreciation 0.30 0.30 0.40 Indirect labor 0.40 0.20 Costs in the Machining cost pool are assigned to products based on machine-hours (MHs) and costs in the Setting Up cost pool are assigned to products based on the number of batches. Costs in the other cost pool are not assigned to products. MORE matchen Product 84 14,700 700 Product co 5,300 1,500 20,000 2,200 Total Additional data concerning the company's products appears below: Product 54 Product co Sales (total) $ 81,500 $ 69,000 Direct materials (total) $ 25,800 $ 28,500 Direct labor (total) $ 41,000 $ 25,800 Required: a. Assign overhead costs to activity cost pools using activity-based costing. b. Calculate activity rates for each activity cost pool using activity-based costing. Determine the amount of overhead cost that would be assigned to each product using activity-based costing. 3. Determine the product margins for each product using activity-based costing. In the tabs below

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!