Question: Please solve for ALL empty boxes and show WORK please. Thank you! Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a

Please solve for ALL empty boxes and show WORK please. Thank you!

Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a system unit, a keyboard, and an installation kit. These pieces are packed together and shipped as a complete kit. In MRP terms, all of these items are level 1 items that make the level 0 kits. Complete the MRP records, using the following information:

Production plans for complete kits are as follows:

Start assembling

8,000 kits in week 2

Start assembling

18,000 kits in weeks 3, 4, and 5

Start assembling

1,500 kits in week 6

The gross requirements for the system unit have already been given to you. For the remaining items, you will need to figure out the gross requirements.

All scheduled receipts, lead times, and beginning inventory levels are shown.

Construct the material requirements plan for item System unit (enter your responses as whole numbers).

Please solve for ALL empty boxes and show WORK please. Thank you!Each Triam Deluxe gamer computer system consists of two speakers, a monitor,a system unit, a keyboard, and an installation kit. These pieces are

all of these items are level 1 items that make the level 0 kits. Complete the MRP records, using the following information: - Production plans for complete kits are as follows: Start assembling 8,000 kits in week 2 Start assembling 18,000 kits in weeks 3,4 , and 5 Start assembling 1,500 kits in week 6 - The gross requirements for the system unit have already been given to you. For the remaining items, you will need to figure out the gross requirements. - All scheduled receipts, lead times, and beginning inventory levels are shown. Click the icon to view the MRP records. Speakers: Lead Time =1 week; Minimum order quantity =1,000 CD-ROM drivers: Lead Time =2 weeks; Minimum order quantity =6,500 \begin{tabular}{lllllll} \hline Week & 1 & 2 & 3 & 4 & 5 & 6 \\ \hline \end{tabular} Gross requirements Scheduled receipts Projected ending inventory: 10,000 Net requirements Planned receipts Planned orders

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!