Question: Please solve for e & f 1. The time-phased net requirements for the base assembly in a table lamp over the next six weeks are:

Please solve for e & f

Please solve for e & f 1. The time-phased net

1. The time-phased net requirements for the base assembly in a table lamp over the next six weeks are: Week 1 2 3 Requirements 335 240 180 4 5 6 340 320 200 The setup cost for the construction of the base assembly is $200, and the holding cost is $0.30 per assembly per week. a. What lot sizing do you obtain from the EOQ formula? b. Determine the lot sizes using the Silver-Meal heuristic. c. Determine the lot sizes using the least unit cost heuristic. d. Determine the lot sizes using part period balancing. e. Determine the lot size using the Wagner-Whitin algorithm. f. Compare the holding and setup costs obtained over the six periods using the policies found in parts (a) through (e) with the cost of a lot-for-lot policy. 1. The time-phased net requirements for the base assembly in a table lamp over the next six weeks are: Week 1 2 3 Requirements 335 240 180 4 5 6 340 320 200 The setup cost for the construction of the base assembly is $200, and the holding cost is $0.30 per assembly per week. a. What lot sizing do you obtain from the EOQ formula? b. Determine the lot sizes using the Silver-Meal heuristic. c. Determine the lot sizes using the least unit cost heuristic. d. Determine the lot sizes using part period balancing. e. Determine the lot size using the Wagner-Whitin algorithm. f. Compare the holding and setup costs obtained over the six periods using the policies found in parts (a) through (e) with the cost of a lot-for-lot policy

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock