Question: Please solve this problem as soon as possible thank you a lot Q5: Note MOV, SUB, ADD and NOP instruction takes one machine cycle time.
Please solve this problem as soon as possible thank you a lot

Q5: Note MOV, SUB, ADD and NOP instruction takes one machine cycle time. Conditional branch takes either 3 cycles or 1 cycle(if condition fails). For an ARM system of 160M Hz, calculate the time taken for following sequence of instructions: a. MOV RO, #0 ADD RO, #1 C. ADD RO.R1 b. MOV RO,#3 L1:NOP SUB RO, RO,#1 BNE L1