Question: PLEASE SOLVE WITHOUT MISTAKES. AGAIN (WITHOUT MISTAKES) !!! Assignment #1 CE 315/L CONSTRUCTION ENGINEERING 3. For the following schedule, draw the node network diagram (AON),

PLEASE SOLVE WITHOUT MISTAKES. AGAIN (WITHOUTPLEASE SOLVE WITHOUT MISTAKES. AGAIN (WITHOUT MISTAKES) !!!

Assignment #1 CE 315/L CONSTRUCTION ENGINEERING 3. For the following schedule, draw the node network diagram (AON), perform the CPM calculations, mark the critical path, and complete the table. Activity Duration Precedent ES EF LS LF TF FF A 5 B 7 A 10 A D 5 A E A F a + 6 B G 4 H 8 B,C B,C,D C,D E 1 2 J 5 K 8 F M H 2 O N P Q 9 E, G 7 F, G, H 3 F, G, H, I 6 HI 4 MNO 3 KL 5 L,M 4 J.P 6 Q 4 QR 1 T,U, S CRITICAL PATH R S T DI V