Question: please use graphs, and if possible DESMOS! 16. The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring

please use graphs, and if possible DESMOS!please use graphs, and if possible DESMOS! 16. The Electrotech Corporation manufactures

16. The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next production period and Electrotech wants to maximize profit. a. Formulate an LP model for this problem. b. Sketch the feasible region for this problem. c. Determine the optimal solution to this problem using level curves. 17. Refer to the previous question. Suppose that Electrotech's management decides that they need to make at least 20 generators and at least 20 alternators. a. Reformulate your LP model to account for this change. b. Sketch the feasible region for this problem. c. Determine the optimal solution to this problem by enumerating the corner points. d. Suppose that Electrotech can acquire additional wiring time at a very favorable cost. Should it do so? Why or why not

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!