Question: Please use R - Squared as evaluation metric. 1 feature selection method. 2 machine learning algorithms ( different types, no models ) . Analysis and

Please use R-Squared as evaluation metric.
1 feature selection method.
2 machine learning algorithms (different types, no models).
Analysis and results
Preliminary conclusions and ideas to further improve your model for the contest.
- Additional feature selection methods (even those not reviewed in class).
- Other feature engineering techniques
- Cross-validation
- Additional machine learning algorithms (even those not reviewed in class).
- Hyper-parameter tuning
- Learning curvesDataset Description: The dataset is composed of several next-day forecast variables, maximum and
minimum temperatures of present-day, and geographic auxiliary variables collected for a period of 5
years by the Korean Meteorological Service over Seoul, South Korea. The output variable is the next-day
average temperature (NextDayAvTemp).
Dataset Variables:
Station: Used weather station number.
Present Tmax: Maximum air temperature between 0 and 21h on the present day (C).
Present Tmin: Minimum air temperature between 0 and 21h on the present day (C).
NextDayPred RHmin: Forecast of next-day minimum relative humidity (%).
NextDayPred_RHmax: Forecast of next-day maximum relative humidity (%)
NextDayPred_Tmax lapse: Forecast of next-day maximum air temperature applied lapse rate (C)
NextDayPred_Imin lapse: Forecast of next-day minimum air temperature applied lapse rate (C)
NextDayPred_WS: Forecast of next-day average wind speed (ms)
NextDayPred_LH: Forecast of next-day average latent heat flux (W/m2)
NextDayPred_CC1: Forecast of next-day 1 st 6-hour split average cloud cover (0-5h.
NextDayPred_CC2: Forecast of next-day 2nd 6-hour split average cloud cover (6-11 h)(%).
NextDayPred_CC3: Forecast of next-day 3rd 6-hour split average cloud cover (12-17 h)(%).
NextDayPred_CC4: Forecast of next-day 4th 6-hour split average cloud cover (18-23 h)(%).
NextDayPred_PPT1: Forecast of next-day 1 st 6-hour split average precipitation (0-5 h)(%).
NextDayPred
 Please use R-Squared as evaluation metric. 1 feature selection method. 2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!