Question: Please, use the figures in the question and provide a complete simulation table as asked. 8) An elevator in a manufacturing plant carries exactly 400

Please, use the figures in the question and provide a complete simulation table as asked.
8) An elevator in a manufacturing plant carries exactly 400 kilograms of material. There are two kinds of material, material A and material B, packaged in boxes. These materials arrive for a ride on the elevator from the first floor to the second floor. A box of material A weights 200 Kg. and a box of material B weights 100 Kg. It takes the elevator 1 minute to go up to the second floor, 2 minutes to unload, and 1 minute to return to the first floor. There is no service priority. The criterion for starting service is that the elevator does not leave the first floor unless it has a full load. Simulate 25 minutes of operation of the system. Apply the event scheduling approach to find the following a) What is the average transit time for a box of material A (time from its arrival until it is unloaded)? b) What is the average waiting time in the queue for a box of material B? c) What is the percentage utilization of the elevator? our solution, you must show t values of the state variables. the changes in th ueue list anges in the futur the cumulative statistic Note that At time zero, the elevator is available and there are one box of material A and one box of Material B have just arrived at the first floor Interarrival time of Material A (min): 5 Interarrival time of Material B (min.): 4 4 5 4 3 6 6 5 5 5 4 4
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
