Question: Please work on this HW manually, without using Excel. Submit your scanned papers on LMS . Show your work on calculations; result only answers will

Please work on this HW manually, without using Excel. Submit your scanned papers on LMS. Show your work on calculations; "result only" answers will get only half credit even if they are correct, and will not get any partial credit if they are wrong.
V = YOUR STUDENT NUMBER (e.g.,5012345->12345)
V = SUM OF DIGITS OF YOUR STUDENT NUMBER (e.g.,5012345->1+2+3+4+5=15)
D&B, a major hardware brand, works with a manufacturer in Taiwan for a particular model of its power tools (Model S24) for sale in Europe through their distribution center (DC) near Munich, Germany. Due to the variety of plug types across different regions in Europe, Model S24 is produced in 4 variants with different plugs and transported using freight from Taiwan. Air freight charges $20 per item shipped and delivers in 1 week regularly, thanks to fixed schedules.
The Taiwanese manufacturer operates with a make-to-order approach, charging $100,000 per production order plus ($10+ V) per item, and requiring a 2-week lead time to prepare each order. Assume that D&B takes ownership of the orders as soon as they leave the manufacturer's facility.
Weekly demand for each variant has the following demand and Normal distributions:
Variant 1| Variant 2| Variant 3| Variant 4
Mean 250(x (10+ V))200(x (10+ V))150(x (10+ V))50(x (10+ V))
Standard Deviation V/10 V/10 V/10 V/25
For each variant, D&B uses a periodic review policy with 6 weeks between orders and incurs a 30% holding cost. Throughout, assume a CL of 91%(Z =1.34), and 52 weeks in a year.
[20] Calculate the safety stock and the QUL to be used for each variant.
[30] Under the current strategy, what is D&B's total annual cost of Model S24, including all variants?
D&B management is considering a postponement strategy where the produce design would be changed to make the power plug connector modular so that the plug base unit (without the power plug) can be sourced from the Taiwanese manufacturer and the power plug can be assembled at D&B's own processing facility near Hamburg, Germany. Proximity of this facility to the channel ensured better overall ease of shipping from Taiwan (instead of air freight). Ocean shipping would cost only $2 per item but have a lead time of 7 weeks on average with a 1-week standard deviation.
The final assembly operation and additional transportation (from the Hamburg facility to the DC) in total would cost $5 per item, but the manufacturer's price would be negotiated down to $210- V. For the base unit inventories, D&B would use a continuous review policy and estimates a holding cost rate of 20%. Assume that D&B will be able to negotiate to take ownership of these items only on delivery.
[20] Calculate the safety stock, the ROP and the optimal order quantity to be used for the base unit.
[30] Under the postponement strategy, what is D&B's total annual cost of Model S24? Does it make sense to implement this idea?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!