Question: Please write neatly will upvote for original answer Problem 3: In a secondary treatment plant, the incoming wastewater with BOD5 of 190 mg/L is treated

Please write neatly will upvote for original answerPlease write neatly will upvote for original answer Problem 3: In a

Problem 3: In a secondary treatment plant, the incoming wastewater with BOD5 of 190 mg/L is treated to remove 90% of the BOD. A BOD test is run after the treatment with a standard 300-ml bottle (no seed). The initial DO is 9.2 mg/L. Answer the following (10 points): a) If at least 2.0 mg/L of DO is wanted at the end of the test, what maximum volume of treated wastewater should be added in the bottle for the test. b) If half of the standard 300-ml bottle is filled with the treated wastewater, what final DO would be expected after five days

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!