Question: Q.2 Consider a flat surface on which you have to dig approx. 100m below the ground surface for an underground subway station. The strata is
Q.2 Consider a flat surface on which you have to dig approx. 100m below the ground surface for an underground subway station. The strata is hard soil/rock. The site can only be accessed from the ground surface. Propose a drilling and hauling equipment if the dumping site is within 50m. Also write the reason of choosing the specific equipment.
Step by Step Solution
3.40 Rating (156 Votes )
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts