Question: pls answer and show work for 1-5 2. (65 pts) A power plant operates on the Rankine cycle, using steam. An adiabatic steam turbine inlet

pls answer and show work for 1-5 pls answer and show work for 1-5 2. (65 pts) A power

2. (65 pts) A power plant operates on the Rankine cycle, using steam. An adiabatic steam turbine inlet (state 3 ) is 350C and 1.0MPa. The outlet conditions (State 4) are P4=0.05MPa. The turbine work output is Ws,turbine=338.7kJ/kg, (1) Calculate the turbine efficiency (15 pts) (2) Calculate H4(15pts) (3) Calculate S4(10pts) (4) Calculate T4. (10 pts) (5) Draw the Rankine cycle process on a T-S diagram. Please also include the TS diagram of water and clearly show where is state 4 and state 4. (15 pts) 2. (65 pts) A power plant operates on the Rankine cycle, using steam. An adiabatic steam turbine inlet (state 3 ) is 350C and 1.0MPa. The outlet conditions (State 4) are P4=0.05MPa. The turbine work output is Ws,turbine=338.7kJ/kg, (1) Calculate the turbine efficiency (15 pts) (2) Calculate H4(15pts) (3) Calculate S4(10pts) (4) Calculate T4. (10 pts) (5) Draw the Rankine cycle process on a T-S diagram. Please also include the TS diagram of water and clearly show where is state 4 and state 4. (15 pts)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!