Question: plz help Subsystems A and B comprise a piping system, and both must operate for the piping system to be functional. Subsystem A consists of

plz help

plz help Subsystems A and B comprise a piping system, and both

Subsystems A and B comprise a piping system, and both must operate for the piping system to be functional. Subsystem A consists of three identical pumps and functions as long as at least two pumps are functional. Subsystem B consists of three identical valves and functions as long as at least one valve is functional. Assume that the reliability of each pump and each valve over the life of piping system are 0.7 and 0.8, respectively. a) Calculate the reliability of the piping system b) If subsystem B is replaced with new one, in which two valves are connected in parallel, fnld the reliability of the new piping system

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!