Question: Pm|rj|Lmax is an identical parallel-machines scheduling problem with release dates and the minimization of the maximum lateness objective. This problem is related to 1|rj|Lmax and
Pm|rj|Lmax is an identical parallel-machines scheduling problem with release dates and the minimization of the maximum lateness objective. This problem is related to 1|rj|Lmax and Pm||Cmax. The problem consists of 3 machines and 20 jobs. Each job has a processing time (pj), a release time (rj) and a due time (dj).
What algorithm(s) should be used to solve this problem. Please provide a step by step on how to solve this using Excel.
Given variables for the problem:
n= 20
m= 3
all processing times, release times, and due times are given as well.