Question: Prepare a bare cost estimate based on national average prices for the following storm drain installation: A trench is to be excavated for 350 ft

Prepare a bare cost estimate based on national
Prepare a bare cost estimate based on national average prices for the following storm drain installation: A trench is to be excavated for 350 ft with cross section as shown in gure. An 18"diameter Ductile Iron pipe must be laid, and the trench will be backlled and compacted. The swell factor is 22% and the shrinkage factor is 15%. Assume that excavation Will be done With a 5/3 CY backhoe. Backlling will be done by hand, and compaction will be in 12" layers with air tamping. Haul any surplus excavated material to the dump site located 3-mile away

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!