Question: Prepare a schedule assigning each activity's overhead cost pool to each product, based on the use of cost drivers. Include a computation of overhead cost

Prepare a schedule assigning each activity's overhead cost pool to each product, based on the use of cost drivers. Include a computation of overhead cost per liter. (Round overhead rate, cost per liter to 3 decimal places, e.g.12.250 and cost assigned to 0 decimal places, e.g.12,250.)
Compute the total manufacturing cost per liter for both products under ABC. (Round overhead cost per liter to 3 decimal places, e.g.
1.225.)
 Prepare a schedule assigning each activity's overhead cost pool to each