Question: Prepare Job - Order Cost Sheets, Predetermined Overhead Rate, Ending Balance of WIP, Finished Goods, and COGS At the beginning of June, Rhone Company had

Prepare Job-Order Cost Sheets, Predetermined Overhead Rate, Ending Balance of WIP, Finished Goods, and COGS
At the beginning of June, Rhone Company had two jobs in process, Job 44 and Job 45, with the following accumulated cost information:
During June, two more jobs (46 and 47) were started. The following direct materials and direct labor costs were added to the four jobs during the month of June:
At the end of June, Jobs 44,45, and 47 were completed. Only Job 45 was sold. On June 1, the balance in Finished Goods was zero.
This information has been collected in the Microsoft Excel Online file. Open the spreadsheet, perform the required analysis, and input your answers in the questions below.
Open spreadsheet
Required:
1. Calculate the plantwide overhead rate based on direct labor cost.
Required:
1. Calculate the plantwide overhead rate based on direct labor cost.
The overhead rate based on direct labor cost is
2. Prepare a brief job-order cost sheet for the four jobs. Show the balance as of June 1 as well as direct materials and direct labor added in June. Apply overhead to the four jobs for the month of June, and show the ending balances. All amount cells must have an entry; enter zeros as needed.
Rhone Company
Job-Order Cost Sheets
For the Month of June
3. Calculate the ending balances of Work in Process and Finished Goods as of June 30.
Work in Process: ()/((/ddagger /))
Finished Goods: ()/()$
4. Calculate the Cost of Goods Sold for June.
Cost of Goods Sold: : Prepare Job-Order Cost Sheets, Fredetermined Overhead Rate, Ending Balance of WIP, Finished Goods, and COGS
At the beginning of June, Rhone Company had two jobs in process, Job 44 and Job 45, with the following accumulated cost information:
DATA
During June, two more jobs (46 and 47) were started. The following direct materials and direct labor costs were added to the four jobs during the month of June:
At the end of June, Jobs 44,45, and 47 were completed. Only Job 45 was sold. On June 1, the balance in Finished Goods was zero.
REQUIRED:
Calculate the overhead rate based on direct labor cost.
Using formulas and cell references from the problem data, perform the required analysis.
Formulas entered in the green cells show in the orange cells. Transfer amounts to CNOWv2 for grading.
Prepare Job - Order Cost Sheets, Predetermined

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!