Question: PREVIOUS ANSWERS DEVORESTAT9 3.5.070.MI. MY NOTES ASK YOUR TEACHER PRACTICE ANOTHER An instructor who taught two sections of engineering statistics last term, the first with

PREVIOUS ANSWERS DEVORESTAT9 3.5.070.MI. MY NOTES ASK YOUR TEACHER PRACTICE ANOTHER An instructor who taught two sections of engineering statistics last term, the first with 25 students and the second with 40, decided to assign a term project. After all projects had been turned in, the instructor randomly ordered them before grading. Consider the first 15 graded projects. (a) What is the probability that exactly 10 of these are from the second section? (Round your answer to four decimal places.) 0 2172 (b) What is the probability that at least 10 of these are from the second section? (Round your answer to four decimal places.) 0.4391 (c) What is the probability that at least 10 of these are from the same section? (Round your answer to four decimal places. ) 0 0125 (d) What are the mean value and standard deviation of the number among these 15 that are from the second section? (Round your mean to the nearest whole number and your standard deviation to three decimal places.) mean projects standard deviation 1 665 projects e) What are the mean value and standard deviation of the number of projects not among these first 15 that are from the second section? (Round your mean to the nearest whole number and your standard deviation to three decimal places.) mean projects standard deviation 1 665 projects Need Help? Read It
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
