Question: Problem 01: Solve the problem using a) Part period balancing b) Wagner-Whitin 17. The time-phased net requirements for the base assembly in a table lamp

Problem 01: Solve the problem using a) Part

Problem 01: Solve the problem using a) Part period balancing b) Wagner-Whitin 17. The time-phased net requirements for the base assembly in a table lamp over the next six weeks are 2. 6 Week Requirements 1 335 3 140 4 440 5 300 200 200 The setup cost for the construction of the base assembly is $200, and the holding cost is $0,30 per assembly per week