Question: Problem 1 ( 1 0 pt ) : A wastewater treatment plant has a flow of 3 0 mgd or 1 . 3 1 m

Problem 1(10pt): A wastewater treatment plant has a flow of 30 mgd or 1.31m3s. The influent BOD is 220mgL. Assume that 25% of the BOD is removed in the primary clarifiers. The plant is designed to carry 3,000mgL of bacteria in the aeration basin.
a) What is the BOD after the primary clarifiers? (This is also the BOD concentration going into the aeration basin.) Find the volume of the aeration basin in m3 to meet an FM ratio of 0.35 mg BOD per mg of biomass per day. (You can think of the F/M ratio as 0.35 day ?-1).
b) What is the wastage rate in kg? day to meet a solids residence time (c) of 8 days?
Problem 2(10pt): Construction and demolition (C&D) debris is a significant portion of municipal solid waste. Roughly, the construction of a typical 2,200 square foot (194m2) residential home generates 2,900 pounds (1,320kg) of wood waste and 690 pounds (313 kg ) of cardboard waste.
a) From Table 1, calculate the lower heating value (LHV) of wood and cardboard in kJkg.
Table 1: Thermodynamic Properties of Some Components of C&D Waste
\table[[,HHV (kJkg),Moisture (%),%H(dry mass)],[Wood,16,500,8.1,5.9],[Cardboard,15,500,12.3,5.5]]
b) Assume that 30% of the C&D debris is recycled, and 70% is incinerated to generate energy. What is the total amount of energy that can be produced from the incinerated C&D debris? Assume the waste-toenergy facility is 24% efficient (i.e.,24% of the fuel energy is converted to usable energy out). For the heat value of wood/carboard, use the average of their respective HHV and LHV.
Problem 1 ( 1 0 pt ) : A wastewater treatment

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!