Question: Problem 1: (10 Points) A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 11

Problem 1: (10 Points) A loan processing

Problem 1: (10 Points) A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 11 loans per day and an effective capacity of 9 loans per day. a. Calculate the Utilization b. Calculate the Efficiency Problem 2: (10 Points) Find the capacity of this system: 22 units/hr 18 units/hr 17 units/hr 2 54 units/hr 51 units/hr 20 units/hr 15 units/hr 18 units/hr 22 units/hr 17 units/hr 18 units/hr