Problem 1 ( 20 Points) Given the following information: Z Inventory on Hand: None Bill of Materials: Routing File: Lot Part Size WC Setup (min) Run Time (min/unit) F(2) D(3) Z 100 30 35 4.0 D 80 40 25 2.0 F 75 50 45 3.0 Work Center Master File: Work Center Available Time Ave. Efficiency* 30 7000 min. 1.10 40 7000 min. .90 50 7000 min. 1.05 *Aaverage efficiency is based on processing time only