Question: Problem 1 ( 3 0 pts ) . a ) Choose an area type, the central business district or else, and a facility type, recreational
Problem pts
a Choose an area type, the central business district or else, and a facility type, recreational or else. pt
b For this area type, select an intersection. At this intersection, determine the number of intersection legs and approaches, typically between to
c For each crossing street, select an average annual daily traffic. Based on the facility type chosen, approximate the directional design hourly flows for each travel direction on each cross street.
d Select a cycle length. You may want to specify the margins within which you can select your cycle. pts
e Decide on the lane number to accommodate your traffic volumes at the intersection given a basic traffic signal scheme and the highway capacity manual approach. You may want to allocate your traffic volume to varied traffic movements at each approach. pts
f Decide on a signal phasing at your intersection. Provide significant turning flows given their
opposing flows so that a basic twophase signal may not do Thus, ensure at least a threephase signal timing. Provide the ring diagram. pt
g Compute the necessary duration of the yellow, all red change clearance and of the minimum green intervals. pts
h Determine your lost time for the cycle as the sum of your yellow plus all red times, and your green extensions minus your startup delays Start up delays and loss times usually cancel out each other. You could select the default values on your HCS software, s
i Provide the signal timing at your intersection as computed by hand.
j Using the HCS software, attempt to time the traffic signal at your intersection. Provide the delays and levels of service for each approach and for the intersection. pts
k Based on the results obtained, is your cycle length sufficient?
Based on the results obtained, are your green times sufficient? You must also ensure that your green times exceed your minimum greens. pt
m Retime your signal to obtain an overall intersection volume to capacity ratio of approximately Also ensure that your signal timing is balanced given the same prevailing volume to capacity ratio for all critical movements. pts
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock