Question: PROBLEM 1 5 : A proposed pulp processing plant is expected to emit 1 2 ton per day of hydrogen sulfide from a single stack.

PROBLEM 15: A proposed pulp processing plant is expected to emit 12 ton per day of hydrogen sulfide from a single stack. The company property extends a minimum of 1500 meters from the proposed location. The nearest receptor
is a small town of 500 inhabitants 1700 meters northeast of the plant. Plant managers have decided that it is desirable to maintain concentrations below 20ppb(parts per billion by volume), or approximately 2.910-5gm-3,
for any period greater than 30 minutes. Wind
direction frequencies indicate that winds blow
from the proposed location toward this town
between 10 and 15 per cent of the time. What
height stack should be erected? It is assumed
that a design wind speed of 2msec-1 will be
sufficient, since the effective stack rise will be
quite great with winds less than 2msec-1.
Other than this stipulation, assume that the
physical stack height and effective stack height
are the same, to incorporate a slight safety
factor.
 PROBLEM 15: A proposed pulp processing plant is expected to emit

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!