Question: Problem 1 6 - 7 5 ( Algo ) Comprehensive Variance Problem ( LO 1 6 - 5 , 6 ) Acobihwood Fixtures mewfactures two

Problem 16-75(Algo) Comprehensive Variance Problem (LO 16-5,6)
Acobihwood Fixtures mewfactures two products, K4 and X7, The compary prepares its master budget on the balis of standard cours.
The following data are for September:
\table[[Standards,54,87],[Direct naterials,9.75 pounds at 16.20 per pound,1 pound an 57,28 par pound],[,1.25 hours at $4.64 per hour,1.59 hours at sid per hour],[Variable overhead (per direct laber-heur),519.89,521.64],[Fixed everheal (per einth),1444,729,5422,438],[Actual results,17,200,23,414],[barect naterial (purchased and used),,],[Birect Labor,9,6ee pounds at M, M, per pound,44,130],[Variable swerhead,53e3,46e,5457,212],[Fixed everhead,5379,740,$489,720],[Units produced (actual),12.964 units,14,430 units]]
Required:
a. Prepare a variance analysis for each variable cost for each product.
b. Prepare a fixed overhead variance analysis for each product.
Note: For all requirements, Do not round infermediate calculations. Indicate the effect of each variance by selecting "F" for favorabile, or "U" for unfaverable. If there is no effect, do not select either option.
\table[[,K4,87],[Price Variance,Emiclency Varlance,Production Wolume Veriance,Price Variance,Efflelency Variance,Production Volume Variance],[Direct materials,,,,,,],[Directilabor,,,,,,],[Variable overtanad,,,,,,],[Fieed overtiead,,,,,,]]
Problem 16-75(Algo) Comprehensive Variance Problem (LO 16-5,6)
Robirwood Rutures manufachures bwo producti, K.4 and XC. The company prepares is masser budget on the bais of slarderd coss The following dati are for September
\table[[Stanaares,54,x],[bifect eaterials,,1 pous of st. te per plost],[bifect later,1.25 heary at sid.6e per har,1,1e nevery of sie per hour],[Wersable suertand (per direct laberaburl,515.80,5.21.40],[Pined everhabel (per sentin),+ Al4, Jie,1493.830],[Esperted activity (difect later-hewrs),17,3tt,37,414],[Artwel results,9,648,14,138 pownst of SYuSe per plunt],[birect labar,14,730,22,230 heurs at sm.30 per hour],[Versable suerhead,15989,64,,5453,212],[*ised evertmed,$ 378,748,4.489,734],[Units preduced (actual),13,440 witt,14,458 whits]]
Required:
2. Prepare a variance analysh for each valubile cost for each product
b. Prepare a fised overhead warlance analysis for each product.
Note: For all requirements, Do not round intermediate calculations. Indicate the effect ef each variance by selecting "F" for fovorable, or "U" for unfavorable. If there is ne effect, do net select elther option.
\table[[,k4,xt],[Prise Variance,Efficiency Wariance,Predultion wolume Verient,Price Variance,EHciency Whance,Freduction Wolum Werarse],[Direat materials,5,5,750,1,F,,8,u,5,0,],[Direct labor,5,4.346,5,F,,5,v,5,0,],[Varable oveltiead,$,u,5,F,,5,u,,f,],[Fixed ovelyead,,7,,,0,,V,,,0]]
Problem 1 6 - 7 5 ( Algo ) Comprehensive Variance

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!