Question: Problem 1 : A new road is under construction using a 6 - in . lift of well graded aggregate. A vibration roller with a

Problem 1:
A new road is under construction using a 6-in. lift of well graded aggregate. A vibration roller with a 6-ft wide drum is brought in to compact the aggregate. Testing with the roller shows that it takes a minimum of 7 passes to meet the desired compaction. If the roller moves at 9mph, how many compacted cubic yards can be produced per hour?
Problem 1 : A new road is under construction

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock