Question: Problem 1 : Design a braced excavation for a large sanitary sewer force - main, which is a reinforced concrete pipe with a diameter of

Problem 1: Design a braced excavation for a large sanitary sewer force-main, which is a reinforced concrete pipe with a diameter of 3m. The trench should be 5m deep and 5m wide. The phreatic surface is below bottom of excavation. The undrained cohesion for the silty clay is Cu=70kPa, and =17kNm2. Assume =0.