Question: Problem 1 : Estimation of a gravity model [ 2 0 ] You are provided with the inter - zonal travel time matrix ( Table

Problem 1: Estimation of a gravity model [20]
You are provided with the inter-zonal travel time matrix (Table 1) and the inter-zonal trip interchange (flow) matrix (Table 2) for the base year for a five-zone system. Calibrate a production-constrained gravity model. Use the following discrete time periods (in minutes) in calibration: {0-5},{5.1-10},{10.1-15}, and {15.1-20}. Perform two iterations.
Table 1. Base year inter-zonal travel time matrix
\table[[tf,1,2,3,4,5
Problem 1 : Estimation of a gravity model [ 2 0 ]