Question: Problem 1 (Problem 4.4 in the Book) A manual assembly line is being planned for an assembled product whose annual demand is expected to be

 Problem 1 (Problem 4.4 in the Book) A manual assembly line

Problem 1 (Problem 4.4 in the Book) A manual assembly line is being planned for an assembled product whose annual demand is expected to be 175,000 units/yr. The line will be operated two shifts (4000 hr/yr). Work content time of the product is 53.7 min. For planning purposes, the following line parameter values will be used: uptime efficiency = 96%, balancing efficiency = 94%, and repositioning time = 8 sec. Determine (a) the required hourly production rate of the line, (b) the cycle time, and (c) the ideal minimum number of workers required, and (d) the actual number of workers required based on the efficiencies given

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!