Question: Problem 1 The maximum possible production for a machine is 600 units per planned production time. The total planned production time for a machine is

Problem 1

The maximum possible production for a machine is 600 units per planned production time. The total planned production time for a machine is 480 minutes. During that time, the machine had 20 minutes of unplanned downtime due to equivalent breakdowns, and 40 minutes of planned downtime for scheduled maintenance. the machine produced 450 good units during the planned production time. Calculate the OEE in terms of losses.

Problem 2

The maximum possible production for a machine is 600 units per hour. During a specific hour of operation, the machine produced 450 good units, but there were 20 units that were produced but deemed defective. Calculate the OEE in terms of losses.

Problem 3

The maximum possible production for a machine is 700 units per planned production time. A production line has a total production time of 480 minutes. During that time, there were 20 minutes of unplanned downtime due to equivalent breakdowns. The line produced 400 good units, but there were 50 units that were produced but deemed defective. Calculate the OEE in terms of losses.

Problem 4

A packaging machine's maximum possible production rate is 600 units per hour. During a specific hour of operation, the machine produced 500 good units, but there were 20 units that were produced but deemed defective. The machine also has 20 minutes of unplanned downtime due to a mechanical issue. Calculate the OEE in terms of losses.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!