Question: Problem 1 . You are planning a utility project that will include 5 0 0 feet of trench excavation and backfill. The trenches will be

Problem 1. You are planning a utility project that will include 500 feet of trench excavation and backfill.
The trenches will be 4.0 feet deep and 3.0 feet wide. Sandy soil backfill will be placed in 8.0 inch lifts
(measured after compaction).
a. What types of compaction equipment could you use to do this work?
b. You choose to use self-propelled manually operated vibratory plate compactors on this job.
The compactor is 3ft wide. From previous jobs, it takes 4 passes to reach optimum
compaction. The compactor travels at a speed of 40 feet per minute. How long will it take to
fully backfill and compact a 100 foot section of trench at 100% efficiency?
c. How long will it take to backfill and compact the entire trench at an efficiency of 50
minutes/hour?
d. If the backfill was predominantly clay soil, would a vibratory plate compactor still be a good
choice? Why or why not?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!