Question: Problem 10-14 Project Evaluation [LO1] Dog Up! Franks is looking at a new sausage system with an installed cost of $515,000. This cost will be
Problem 10-14 Project Evaluation [LO1]
| Dog Up! Franks is looking at a new sausage system with an installed cost of $515,000. This cost will be depreciated straight-line to zero over the projects five-year life, at the end of which the sausage system can be scrapped for $81,000. The sausage system will save the firm $153,000 per year in pretax operating costs, and the system requires an initial investment in net working capital of $32,000. If the tax rate is 22 percent and the discount rate is 10 percent, what is the NPV of this project? (Do not round intermediate calculations and round your answer to 2 decimal places, e.g., 32.16.)
| ||
|
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts