Question: Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced
Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2
The following data are for the two products produced by Tadros Company.
| Product A | Product B | ||||
| Direct materials | $ | 14 per unit | $ | 25 per unit | |
| Direct labor hours | 0.4 DLH per unit | 1.6 DLH per unit | |||
| Machine hours | 0.3 MH per unit | 1.2 MH per unit | |||
| Batches | 115 batches | 230 batches | |||
| Volume | 10,000 units | 2,000 units | |||
| Engineering modifications | 8 modifications | 40 modifications | |||
| Number of customers | 500 customers | 400 customers | |||
| Market price | $ | 35 per unit | $ | 95 per unit per unit | |
The company's direct labor rate is $20 per direct labor hour (DLH). Additional information follows.
| Costs | Driver | |||
| Indirect manufacturing | ||||
| Engineering support | $ | 25,500 | Engineering modifications | |
| Electricity | 21,600 | Machine hours | ||
| Setup costs | 41,000 | Batches | ||
| Nonmanufacturing | ||||
| Customer service | 75,000 | Number of customers | ||
Required: (Round your per unit cost answers to 2 decimal places and other answers to nearest whole number. Loss amounts should be indicated with minus sign.)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
