Question: Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced
Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced by Tadros Company. Product A Product B Direct materials $ 14 per unit $ 26 per unit Direct labor hours 0.5 DLH per unit 1.6 DLH per unit Machine hours 0.4 MH per unit 1.2 MH per unit Batches 105 batches 210 batches Volume 10,000 units 2,000 units Engineering modifications 9 modifications 45 modifications Number of customers 500 customers 400 customers Market price $ 34 per unit $ 95 per unit The company's direct labor rate is $20 per direct labor hour (DLH). Additional information follows. Costs Driver Indirect manufacturing Engineering support $ 23,000 Engineering modifications Electricity 32,000 Machine hours Setup costs 43,000 Batches Nonmanufacturing Customer service 72,000 Number of customers Required: (Round your per unit cost answers to 2 decimal places and other answers to nearest whole number. Loss amounts should be indicated with minus sign.)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
