Question: Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products




Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced by Tadros Company. Direct materials Direct labor hours Machine hours Batches Volume Number of customers. Engineering modifications. Market price Product A $20 per unit 0.5 DLH per unit 0.4 MH per unit 200 batches 16,000 units 18 modifications. 800 customers $55 per unit Product B $25 per unit 1.5 DLH per unit. 1.2 MH per unit 360 batches 3,600 units 82 modifications 720 customers $220 per unit The company's direct labor rate is $20 per direct labor hour (DLH). Additional information follows. Indirect manufacturing Costs Driver Engineering support $ 53,600 Electricity Engineering modifications 42,880 Machine hours. Setup costs Nonmanufacturing Customer service 144,400 Number of customers 171,520 Batches Required: (Round your per unit cost answers to 2 decimal places and other answers to nearest whole number. Loss amounts should be indicated with minus sign.) 1. Compute the manufacturing cost per unit using the plantwide overhead rate base on direct labor hours.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
