Question: PROBLEM 17-3A PART 5 Problem 17-3A Part 5 Required: 5. If the company used a plantwide overhead rate based on direct labor hours, what is

Problem 17-3A Part 5 Required: 5. If the company used a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.) $ Overhead costs Direct labor hours Product DL hours Plantwide OH Job 3175 Job 4286 500 4,375 $ $ rate 52.31 52.31 Total Overhead Cost $ 26,155 $ 228,856 Units Produced 200 2,500 OH Cost per unit $ 266.18 $ 186.32 Questions 7. 9 (of 9) > | Save & Exit Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 [The following information applies to the questions displayed below.] Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Indirect Labor $320,000 Indirect Materials Other Overhead Production Activity Grinding Polishing Product modification Providing power System calibration $ 135,000 600,000 $255.000 500,000 Additional information on the drivers for its production activities follows. Grinding Polishing Product modification Providing power 13.000 machine hours 13,000 machine hours 1500 engineering hours 17.000 direct labor hours 400 batches System calibration Number of units Machine hours Engineering hours Batches Direct labor hours Job 3175 200 units 550 MH 26 eng hours 30 batches 500 DLH Job 4286 2.500 units 5.500 MH 32 eng hours 90 batches 4.375 DLH References Section Break Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 Required infor 2.77 points You received credit for this question in a previous attempt
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
