Question: Problem 2 ( 1 5 pts ) The engineers at the facility asked some Tec de Monterrey students to design a fixture to make the
Problem
pts
The engineers at the facility asked some Tec de Monterrey students to design a fixture to make the drilling process for the piece described in Problem faster than it currently is To verify if the objective was accomplished, samples using the new fixture were taken. The registered times are shown below:
tablePiece IDtableDrill time forpieceTcseconds
Considering the data from Problem and the data for this problem, can we say that the fixture made the drilling process faster? Justify your answer. pts
Considering that it was expected to reduce the drilling time to or less seconds per piece, can we say this objective was achieved? Justify your answer. pts