Question: Problem 2 ( 1 5 pts ) The engineers at the facility asked some Tec de Monterrey students to design a fixture to make the

Problem 2
(15 pts)
The engineers at the facility asked some Tec de Monterrey students to design a fixture to make the drilling process for the piece described in Problem 1 faster than it currently is. To verify if the objective was accomplished, 17 samples using the new fixture were taken. The registered times are shown below:
\table[[Piece ID,\table[[Drill time for],[piece],[48Tc003814],[(seconds)]]],[1,8.5],[2,12.3],[3,12.42],[4,9.44],[5,7.59],[6,5.78],[7,7.39],[8,9.54],[9,9.33],[10,8.5],[11,9.74],[12,9.14],[13,8.2],[14,7.31],[15,6.83],[16,9.26],[17,7.69]]
Considering the data from Problem 1 and the data for this problem, can we say that the fixture made the drilling process faster? Justify your answer.(9 pts)
Considering that it was expected to reduce the drilling time to 10 or less seconds per piece, can we say this objective was achieved? Justify your answer. (6 pts)
Problem 2 ( 1 5 pts ) The engineers at the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!