Question: Problem 2 . 1 I The normal time for a work cycle in a worker - machine system is 6 . 2 7 min. For
Problem I
The normal time for a work cycle in a workermachine system is min. For setting the standard time, the PFD allowance factor is and the machine allowance factor is The work cycle includes manual elements totaling a normal time of min, all but min of which are performed as internal elements. Determine a the standard time for the cycle and b the daily output at standard performance. c During an hour shift, the worker lost min due to personal time, rest breaks, and delays, and she produced pieces. What was the worker's pace on the operatorcontrolled portion of the shift?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
