Question: PROBLEM 2 : ( 2 0 Marks ) Bangs Leisure Chairs produces three hand - crafted outdoor chairs famous for beaches, pools, and patios: sling,
PROBLEM : Marks Bangs Leisure Chairs produces three handcrafted outdoor chairs
famous for beaches, pools, and patios: sling, Adirondack, and hammocks. The unit profit for
these products is $ $ and $ respectively. Each type of chair requires cutting,
assembling, and finishing. The owner is retired and willing to work six hours per day for five
days per week, so he has hours available each month. He does not want to spend more than
hours each month on any one activity that is cutting, assembling, and finishing The
retailer he works with ensures that all products he makes can quickly be sold. Sling chairs are made up of ten wood pieces for the frame and one piece of cloth. The actual cutting of the
wood takes minutes. Assembling includes sewing the fabric and the attachment of rivets,
screws, fabric, and dowel rods, which takes minutes. The finishing stage involves sanding,
staining, and varnishing the various parts, which takes one hour. Adirondack chairs take one
and a half an hour to cut and one hour to assemble, and finishing takes one hour. For hammocks,
cutting takes hours, assembly takes hours, and finishing takes one hour. How many of
each type of chair should he produce each month to maximize profit?
a Develop a linear optimization model for the problem on a spreadsheet in Excel.
marks
b What is the optimal solution for the problem? marks
c Create a Sensitivity Report and answer the following questions:
i Suppose we forced sling chairs to be in the solution; what would happen to the
objective functions value? marks
ii What are the maximum and minimum values of the objective function coefficients
for sling chairs, Adirondack chairs, and hammocks for which the current optimal
solution is valid? marks
iii What do the shadow prices for the Assembling Hours Used and Total Hours Used
constraints mean? marks
iv What are the maximum and minimum values for the cutting, assembly, and finishing
hours used constraints for which the current constraint value does not change?
marks
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
