Question: Problem 2 (20 points) Ali, a recent industrial engineer graduate has been told that his company needs 2880 electronic circuit boards to be assembled every

Problem 2 (20 points) Ali, a recent industrial
Problem 2 (20 points) Ali, a recent industrial engineer graduate has been told that his company needs 2880 electronic circuit boards to be assembled every day. There are 20 productive hours in each working day. Work Task Task Time (seconds) Task Predecessor(s) 24 B 8 14 B D 10 E 6 D F 6 E, C G 5 E H 20 F G 1 7 CH a) Construct a precedence diagram of the assembly line (5 points) b) Calculate the theoretical minimum number of workstations and balance this line using the longest task time heuristic. (10 points) c) Calculate the efficiency and balance delay of the line (5 points)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!